2018 Automation & SCADA

Laos–Cambodia 115 kV Grid Interconnection SCADA

Électricité du Laos (EDL) undertook a project to install an Automation SCADA system to monitor, control and manage the 115 kV high-voltage transmission network, interconnecting the power systems of Laos and Cambodia at the Ban Hat Substation in southern Laos. We were responsible for design and development, testing, report approval, installation (CT, VT, PMU, automation I/O instrumentation, TCP/IP networks and electrical cabling), software development, customer service and system commissioning.